Read the previous article
Load Shedding: what it looks like
Element
|
Description
|
---|---|
Enabled | Includes/excludes the load from the function algorithm |
Name | Name assigned to the load |
Power consumption |
Rated power of the load
|
Disconnection priority
|
Position of the load in the load disconnection sequence. Priority 1 corresponds to the first load to be disconnected. |
Element | Description |
---|---|
Signal status/Commands > Contact | Device cable used for signal.
|
Signal status > Meaning | (only if the device used for the signal is a circuit breaker and the optional status signal is activated). Meaning of the status signal:
|
Signal status > Polarity |
|
Signal status > Delay | Delay in seconds before the signal is processed after reception |