Read the previous article
                                Load Shedding: what it looks like
                            | 
			 Element 
			 | 
			
			 Description 
			 | 
		
|---|---|
| Enabled | Includes/excludes the load from the function algorithm | 
| Name | Name assigned to the load | 
| Power consumption | 
			 Rated power of the load 
			 | 
		
| 
			 Disconnection priority 
			 | 
			Position of the load in the load disconnection sequence. Priority 1 corresponds to the first load to be disconnected. | 
		
| Element | Description | 
|---|---|
| Signal status/Commands > Contact | Device cable used for signal.
			
  | 
		
| Signal status > Meaning | (only if the device used for the signal is a circuit breaker and the optional status signal is activated). Meaning of the status signal: 
  | 
		
| Signal status > Polarity | 
			
  | 
		
| Signal status > Delay | Delay in seconds before the signal is processed after reception |